Meeting Notes 9-25-12
Meeting Type: Advisor Meeting with Dr. Amin and Dr. Shih
Attending:
Advisor(s): Dr. Amin, Dr. Shih
Members: Kyle, Sondra, Greg, Stuart, Santi, Alex
Excused: N/A (Darryl told us about his GRE this morning, not excused)
Action Items
- Submit hard copy of team building assignment
- Send Dr. Amin a link to our website, email him whenever the minutes are updated
- Add link to Gantter on website
- Get in touch with Michael Greenleaf
- (Aside) Decide what we do, if anything, about unexcused absences
Meeting Topics
- Introduction and Meeting Expectations
- Summary of current progress for Dr. Amin
Important Notes
- Biweekly report, hard copy for now
- Peter (TA) will show MEs how to set up website with CMS next Tuesday
- Email Dr. Amin whenever new meeting minutes are posted to the website
- Dr. Shih and Dr. Amin willing to help look over our grant proposal
- Dr. Shih wants us to learn new things and make it to competition this year!
Transcript (Notes)
- Introduced ourselves
- Peter will give us a walkthrough on what to submit to CMS to set up our COE website
- Date TBA, hopefully next week, on Tuesday
- Meeting minutes should be done (at these meetings) by rotation
- Bring a Biweekly report to these meetings to bring Dr. Amin up to date on progress
- Hard copy, but may be able to submit digitally once BB is set up properly
- Needs Assessment due Thursday online, if no BB available a hardcopy should be submitted
- We will receive credit for team building assignment, submit hard copy to Dr. Amin
- Told them that we do not need to present to Dr. Frank
- We will try to get as many ECE advisors as possible to ME meetings
- We are responsible for getting our advisors to attend if possible
- They will try to get a finalized schedule out as soon as possible for our advisors' benefits
- Told them that Dr. Frank just wants a copy of our deliverables when they're due for ME
- Dr. Amin will meet with Dr. Frank to speak with him personally about what's going on with ECEs as well
- Gave him a hard copy of our Needs Assessment
- Told him our needs assessment references last year's requirements
- Told him where we are on the project
- Working on getting it apart
- Need to make it easier to access (over two hours take apart and put together)
- Overweight
- Voltage regulator issues
- First two weeks: come up with new design for frame, new design for voltage regulators
- New design will reduce in-water wobble, make it easier to access electronics
- ME design will largely recreate part of the body, but as much will be kept as possible
- Changing the layout of the machine to make less front-heavy
- Sub must be kept completely level throughout competition
- Major problems to address
- Haven't had a chance to talk with Michael Greenleaf
- They would be willing to look over our grant proposal
- Dr. Shih wants us to go to competition as our sponsor
- Scheduling on Gantter is a good way to see our progress, wants to see it
Group Notes
None